How long to get grid power in any US county. 39,173 filings, 1,574 counties, dated sources.
Maintain this server? Claim it
Call this server's tools from your browser. Nothing to install.
Requests go through mcptry because browsers can't call most MCP servers directly. Header values are sent to the server for that request only and are never stored or logged.
Tool list from our last check. Connect live to refresh it.
Credits remaining on the calling key, and how to top up without a human.
This tool takes no arguments.
Credits remaining on the calling key, and how to top up without a human.
No arguments.
{
"type": "object",
"properties": {}
}Full grid intelligence for one US county: queued MW, connected capacity, project count, median wait, lead technology.
| Argument | Type | Description |
|---|---|---|
| state* | string | Two-letter state code |
| county | string | County name, e.g. 'Loudoun' |
{
"type": "object",
"required": [
"state"
],
"properties": {
"state": {
"type": "string",
"description": "Two-letter state code"
},
"county": {
"type": "string",
"description": "County name, e.g. 'Loudoun'"
}
}
}Cluster request windows, filing deadlines and compliance dates for US interconnection queues, with days remaining. Every date carries its source and how well it has been checked — a date marked unconfirmed came from a secondary source and has not been verified against the authority's own tariff. Do not present an unconfirmed date as a commitment.
| Argument | Type | Description |
|---|---|---|
| rto | string | PJM, MISO, CAISO, SPP, NYISO, ISONE, ERCOT or FERC |
| upcoming_only | boolean |
{
"type": "object",
"properties": {
"rto": {
"type": "string",
"description": "PJM, MISO, CAISO, SPP, NYISO, ISONE, ERCOT or FERC"
},
"upcoming_only": {
"type": "boolean",
"default": true
}
}
}Large-load connection requests — requests to connect big new DEMAND to the US grid. 528 requests on file from BPA and NYISO only; 494 state no end use, so most cannot be attributed to data centers or any other industry. Does not yet include ERCOT, PJM, MISO, CAISO, SPP or ISO-NE. Filter by state or size.
| Argument | Type | Description |
|---|---|---|
| limit | number | |
| state | string | |
| min_mw | number |
{
"type": "object",
"properties": {
"limit": {
"type": "number",
"default": 25
},
"state": {
"type": "string"
},
"min_mw": {
"type": "number"
}
}
}GeoJSON FeatureCollection of grid activity for rendering a map: generation queue by county, data-center power requests, and AI campuses.
| Argument | Type | Description |
|---|---|---|
| layer | string |
{
"type": "object",
"properties": {
"layer": {
"enum": [
"all",
"generation",
"load",
"datacenters"
],
"type": "string",
"default": "all"
}
}
}Tracked policy events — data-center moratoria, large-load tariffs, FERC and state dockets — with direction (opening/closing) and citations.
| Argument | Type | Description |
|---|---|---|
| direction | string |
{
"type": "object",
"properties": {
"direction": {
"enum": [
"opening",
"closing",
"neutral"
],
"type": "string"
}
}
}Search 39,173 US grid connection applications by region, status, fuel, state or size. Returns project rows with MW, county, wait time and outcome.
| Argument | Type | Description |
|---|---|---|
| fuel | string | Solar, Wind, Battery, Gas, Nuclear, Hybrid… |
| limit | number | |
| state | string | Two-letter state code |
| min_mw | number | |
| region | string | ERCOT, PJM, MISO, CAISO, NYISO, ISONE, SPP, BPA or a utility name |
| status | string |
{
"type": "object",
"properties": {
"fuel": {
"type": "string",
"description": "Solar, Wind, Battery, Gas, Nuclear, Hybrid…"
},
"limit": {
"type": "number",
"default": 25
},
"state": {
"type": "string",
"description": "Two-letter state code"
},
"min_mw": {
"type": "number"
},
"region": {
"type": "string",
"description": "ERCOT, PJM, MISO, CAISO, NYISO, ISONE, SPP, BPA or a utility name"
},
"status": {
"enum": [
"active",
"completed",
"withdrawn",
"suspended"
],
"type": "string"
}
}
}